Channels and pipelines

Channels and pipelines

Water collecting and supply channels system for "Vlasina" power plant 

Channels total length 

55.300 m 

Effective cross-section 

0,50-2,70 m2 

Channel lining 

concrete 

Construction time 

1949-1957 

Employer 

Hydropower plant "Vlasina" Surdulica 

Land reclamation system - "Južnopećki kanal" 

Channels total length 

55.300 m 

Effective cross-section 

0,50-2,70 m2

Channel lining

concrete

Construction time

1949-1957

Employer

Hydropower plant "Vlasina" Surdulica

Water supply pipeline - "Lab"

Total pipeline length

12.500 m

Pressure pipeline length

1.000 m

Concrete pipeline diameter

700 mm

Pressure pipeline diameter

500 mm

Year of completion

1962

Employer

Kosovo lignite mines "Obilić"


Water supply pipeline for Thermo-power plant "Kosovo" III

Total pipeline length

11.570 m

Pipeline diameter

900 mm

Year of completion

1966

Employer

Kosovo lignite mines  "Obilić"

Land reclamation system "Čitluk" Kruševac

Length

20.000 m

Cross-section

0.10 - 1.00 m2

Channel lining

concrete

Length

22.000 m

Diameter

300-700 mm

Year of completion

1958

Employer

Water Community Kruševac

Land reclamation system "Ribnik" Kruševac

Length

22.000 m

Diameter

300-800 mm

Year of completion

1958

Employer

Water Community Kruševac

Land reclamation system "Zabreške bare" Obrenovac

Construction time

1990-1991

Employer

Hydropower plant "Djerdap"

Land reclamation system "Dubravička kaseta"
Protection embankment and channel network with culverts

Construction time

1988-1989

Employer

Hydropower plant "Djerdap"


Drainage channel "Borča 2"

Year of completion

1998

Employer

Hydropower plant "Djerdap"

Drainage system "Velika bara" Kupinac-Obrenovac

Drainage area

8.600 ha

Construction time

1985-1986

Employer

Agricultural combine "Beograd"

Fish pond in Dokmir village, Ub
Water intake was constructed on rivers Ub and Dokmirica, supply and outlet channels as well.

Construction time

1989

Employer

AIK"Valjevo" PIK UB

Drainage system "Vukićevica" with pump station, Obrenovac

Drainage system area

4.500 ha

Construction time

1989

Employer

PKB "Dragan Marković"

Pump stations (5 units)
Borča.Belanoš-Beograd "Skela".Kupinac "Vič bara" - Obrenovac in scope of drainage system

Average dimensions of station

5x15x6 m

Construction time

1984-1986

Employer

Hydropower plant "Djerdap" Beograd


Development of Velika Morava river upper part

Length of development area

11.600 m

Year of completion

1963

Employer

Directorate for development of Velika Morava catchment area

Nišava river development project

Length of development area

9.500 m

Year of completion

1958

Employer

Water development directorate ,Beograd

Trbusnica river development project

Length of development area

6.500 m

Year of completion

1957

Employer

Factory "Viskoza" Loznica

Toplodoiska river development project

Length of development area

1.400 m

Construction time

1986-1987

Employer

Water utilization company of Beograd

"Resnik" dam and storage reservoir
Embankment volume 50.000 m3 with bottom outlet and discharge structure

Year of completion

1987

Employer

Water utilization company of Beograd