Traffic Tunnels

Traffic Tunnels

 

Following tunnels were constructed on "Beograd-Bar" railway

Goleš 

Length 

4.940 m 

Diameter 

5.25x4.25 m 

Construction time 

1969-1972

Samarevina

Length

1.670 m

Diameter

5.25x4.25 m

Construction time

1969-1972

Ribnica

Length

1.535 m

Diameter

5.25x4.25 m

Construction time

1969-1972

Tunnel no.17

Length

115 m

Diameter

5.25x4.25 m

Construction time

1969-1972

Tunnel no.18

Length

185 m

Diameter

5.25x4.25 m

Construction time

1969-1972

Tunnel on road Bajina Bašta-Užice

Length

304 m

Diameter

5.0 m

Construction time

1968-1970